{"help": "https://data.gov.au/data/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Carrathool Shire Council", "author_email": null, "contact_point": "council@carrathool.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "6ddab5a5-cca8-4328-9983-0b089320b087", "isopen": false, "license_id": "cc-by", "license_title": "Creative Commons Attribution 3.0 Australia", "license_url": "http://creativecommons.org/licenses/by/3.0/au/", "maintainer": null, "maintainer_email": null, "metadata_created": "2025-06-24T05:21:41.743305", "metadata_modified": "2025-12-18T13:54:21.702173", "name": "nsw-fdp-hillston-frmsp-reports", "notes": "The zip file contains the:\nHillston Flood Study\nHillston Flood Risk Management Study and Plan", "num_resources": 1, "num_tags": 4, "organization": {"id": "b109ca3f-a64e-40d6-90a9-abd2e643d866", "name": "carrathool-shire-council-datansw", "title": "Carrathool Shire Council", "type": "organization", "description": "Carrathool Shire consists of the town of Hillston, and the surrounding villages of Goolgowi, Merriwagga, Rankins Springs and Carrathool, and includes the Murrumbidgee River and Lachlan River.\r\n\r\nhttp://www.carrathool.nsw.gov.au/\r\n\r\nThe Lachlan River is subject to periodic flooding. There is an extensive and complex network of creeks and secondary waterways that run generally in a \"big\" river. When flood conditions are reached  these waterways spill and a wide rural floodplain is created. In flood conditions the water is slow-moving and floodway many kilometres across.\r\n\r\nCouncil established a Rural Floodplain Management Committee and working with the community and State Government have developed a Rural Floodplain Management Plan, titled Lachlan River - Lake Brewster to Whealbah - Rural Flood Study (2006) (PDF). Implementation of the plan has seen a wide range of works across the floodplain by Council and also land-owners working in partnership. Works have included:\r\n\u2022removal of levees and irrigation channels,\r\n\u2022clearing waterways & depressions and\r\n\u2022providing new major pipes and road culverts.\r\n\r\nThe objective of all these works have been to return the floodplain more to its natural state and permit the flood to run freely.\r\n", "image_url": "", "created": "2025-06-24T05:30:43.877976", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-hillston-frmsp-reports", "title": "DataNSW"}, "original_name": "nsw-fdp-hillston-frmsp-reports", "owner_org": "b109ca3f-a64e-40d6-90a9-abd2e643d866", "private": false, "promotion_level": "0", "remote_last_updated": "2025-12-17 02:05:42.200064", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2023-03-23 00:34:34.765537", "temporal_coverage_to": "2022-10-01 00:00:00", "title": "Hillston Flood Risk Management Study and Plan - Reports", "type": "dataset", "unpublished": false, "url": "", "version": null, "extras": [{"key": "harvest_object_id", "value": "ef904daa-5a94-485c-b165-d6e896cf6359"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2025-12-17T02:05:42.268505", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "6e860285-b171-4b26-9abb-721e08c4991c", "last_modified": null, "metadata_modified": "2025-12-18T13:54:16.087948", "mimetype": null, "mimetype_inner": null, "name": "Hillston FRMSP Reports", "package_id": "6ddab5a5-cca8-4328-9983-0b089320b087", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/1a761d64-73db-4c8e-b984-e37c60aa02f6/resource/e9c7ef7d-4980-4021-918d-b4ed1f8c8374", "url_type": null, "zip_extract": false}], "tags": [{"display_name": "Carrathool Council", "id": "d892672a-6f34-41ea-a9b4-405c08ed1a22", "name": "Carrathool Council", "state": "active", "vocabulary_id": null}, {"display_name": "FRMSP", "id": "7682d60c-957b-41dc-ad4e-8b9185e1eafb", "name": "FRMSP", "state": "active", "vocabulary_id": null}, {"display_name": "Flood Risk Management Study", "id": "cc4aa127-71aa-4992-ae4d-1ec3c8a21c63", "name": "Flood Risk Management Study", "state": "active", "vocabulary_id": null}, {"display_name": "hillston", "id": "ddd51b58-4d28-4928-8860-5d2ab0664d27", "name": "hillston", "state": "active", "vocabulary_id": null}], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}