-
Salinity Hazard for Catchment Action Plan (CAP) Updates: Southern Rivers CMA...
The thirteen NSW Catchment Management Authorities (CMAs) are required to update their Catchment Action Plans (CAPs) in a process to be completed by early 2013. The CAPs are... -
Singh's Ready Mixed Concrete Pty. Ltd. : environmental impact statement for...
EIS: Singh's Ready Mixed Concrete Pty. Ltd. : environmental impact statement for the extraction and processing of sand from tailings stockpiles, Watsons Creek -
Natural Vegetation of the Howes Valley 1:100,000 map sheet. Benson D.H.,...
Benson and Howell (1995) Composition and extent of the present natural vegetation within the Hawkesbury-Nepean catchment area found on the Howes Valley 1:100 000 map sheet 9032,... -
Environmental impact statement, northern open cut extension, CSR Lemington Mine
EIS: Environmental impact statement, northern open cut extension, CSR Lemington Mine -
CEEC: Monaro and Werriwa Tablelands Cool Temperate Grassy Woodlands v1.4
The Monaro and Werriwa Tablelands Cool Temperate Grassy Woodlands (respectively Monaro and Werriwa) have been nominated by the NSW Scientific Advisory Committee as Critically... -
2017 Monthly Hillslope Bare Soil Erosion
Individual Monthly Hillslope Bare Soil Erosion (t.ha-1.month-1) over New South Wales for 2017. -
NSW Major Operating Mines
Major operating mines in NSW, including locations, names and the resource being mined. The Geological Survey of NSW has developed a major NSW operating mineral mines layer by... -
2024 Monthly Hillslope Bare Soil Erosion
Individual Monthly Hillslope Bare Soil Erosion (t.ha-1.month-1) over New South Wales for 2024. -
NSW Water Dashboards-Water Balance Tool
Water Balance Tool dashboard: The water balance tool presents monthly water balance volumes (losses and gains) at a reach scale. -
Extant natural vegetation for Cobbadah, Manilla and Tamworth VIS_ID 3796
Extant natural vegetation is mapped to local scale plant community level in the Cobbadah, Manilla and Tamworth 1 : 100 000 mapsheets. The mapsheets fall within the Namoi and... -
Environmental impact statement for an existing quarry at "Warrambui", Yass...
EIS: Environmental impact statement for an existing quarry at "Warrambui", Yass River Road, Murrumbateman, NSW -
Proposed residential development July 1998 (1996-36-4 Doc 96-36 (4)-2 Vol 2)
Proposed residential development July 1998 (1996-36-4 Doc 96-36 (4)-2 Vol 2) -
Repealed - State Environmental Planning Policy (Western Sydney Employment Area) 2009
NSW Department of Planning, Housing and Infrastructure
This is a repealed State Environmental Planning Policy and has been superseded by the State Environmental Planning Policy (Industry & Employment) 2021 as part of the... -
Environmental impact statement for coal washery reject emplacement in the...
EIS: Environmental impact statement for coal washery reject emplacement in the southern gully on part portion 151, Russell Vale, NSW for Bellambi Coal Company Pty Ltd / -
Contaminated Land - Record of Notices
Record of Contaminated Land Notices Issue Contaminated Land Public Record is a searchable database on the NSW Environment Protection Authority’s (EPA) website. The record... -
Vegetation of the Balranald area. VIS_ID 3178
This data set is a map belonging to the 1:250 000 vegetation map series. This paper includes a detailed vegetation map together with a list of about 500 species including exotic... -
NSW Foundation Spatial Data Framework - Water - NSW Fuzzy Extent Water Line
NSW Fuzzy Extent Water Line is a linear feature class representing the approximate extents of formally named water features that have relatively indistinct name extent. Fuzzy... -
High Ecological Value Waterways and Water Dependent Ecosystems - MOSMAN LGA
A map of the high ecological value waterways and water dependent ecosystems for the Mosman LGA was prepared by the Science Division of the Department of Planning, Industry and... -
Southeast and Tablelands Regional Plan Corridors
Biodiversity corridors which are identified for consideration in the South East and Tablelands Regional Plan. These corridors were mapped by refining connectivity models for a... -
Continuation of sand and gravel extraction and site rehabilitation, Part Lot...
EIS: Continuation of sand and gravel extraction and site rehabilitation, Part Lot 1, DP 812981, Parish of Wamboin : environmental impact statement