-
Narrandera Floodplain Management - Consequence Management Plan
The initial aims of the engagement were to investigate the structural integrity of the canal embankment (acting as the town’s levee bank) with a view to determining the best... -
MLI&D_Flood_Damages
Mungindi NSW Town Levee Investigation and Concept Design Flood Damages Data -
Penrith CBD Floodplain Risk Management Study and Pan Hydraulic model intput files
Penrith CBD Floodplain Risk Management Study and Pan Hydraulic TUFLOW model for design flood events under existing catchment condition -
Cranebrook Overland Flow Flood Study prep-processed results
Pre-processed results from the hydraulic model Tuflow -
Lake Macquarie - Floodplain Management Plan August 2001
Floodplain Management Plan Report and figures. This Plan provides the basis for the future management of flood liable lands adjacent to the lake in the Lake Macquarie City... -
Tomakin, Mossy Point, Broulee and Mogo Flood Study - FPA
Flood Planning Area (cadastre) -
Eden, Twofold Bay, Towamba River Flood Study - FPL
Flood Planning Level grids -
Nowra and Browns Creeks Flood Study - Survey
Cross-section and topographic DWG data -
Flood Mitigation Works at Hermitage Flat, Lithgow - Review of Environmental...
Report (including appendices A to C) and Appendix D (part 1 and part 2)