{"help": "https://data.gov.au/data/en/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Cumberland Council", "author_email": null, "contact_point": "council@cumberland.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "0c254f53-6ac1-44d8-94dd-bf2d74f7af12", "isopen": false, "license_id": "lsba", "license_title": "lsba", "maintainer": null, "maintainer_email": null, "metadata_created": "2025-06-23T18:39:32.879204", "metadata_modified": "2025-06-23T18:39:35.561572", "name": "nsw-fdp-haslams-creek-frmsp", "notes": "AIMS OF THE CURRENT STUDY\nIn broad terms, the current Floodplain Risk\nManagement Study has investigated what can be\ndone to minimise the effects of flooding in the\nHaslams Creek catchment and recommended a\nstrategy in the form of a draft Floodplain Risk\nManagement Plan.\nSpecific objectives of the study include:\n\na review of the results from the 1999 Flood\nStudy;\nconsideration of the potential for culvert\nblockages and associated flood impacts;\nthe implementation of a community consultation\nstrategy, to ensure community input is obtained\nat key times throughout the study;\na description and quantification of the flood\nproblems in the Haslams Creek catchment\nincluding the likely cost of flooding to the local\ncommunity;\nthe identification and assessment of potential\nfloodplain risk management measures to reduce\nthe risks and hazards of flooding;\na detailed review of issues relating to planning\nand development controls within the floodplain.\nDon Fox Planning Pty Ltd has prepared a\ndocument entitled Report on Planning Issues as\npart of this study. It is reproduced in Appendix\nA. Included in this report, is a proposed draft\nDevelopment Control Plan (DCP) entitled\n\u201cManaging Our Flood Risks\u201d;\nthe development of a recommended draft\nFloodplain Risk Management Plan for the\nHaslams Creek catchment that outlines the best\nmeasures to reduce flood damage, based on\nenvironmental, social, economic, financial and\nengineering considerations.\n", "num_resources": 2, "num_tags": 4, "organization": {"id": "aeb69f32-d40e-4eed-a699-7d1a8ef0519f", "name": "cumberland-council-datansw", "title": "Cumberland Council", "type": "organization", "description": "The Cumberland Council area is located in Sydney's western suburbs, about 25 kilometres from the Sydney CBD; home to over 220,000 people.\r\n\r\nhttp://www.cumberland.nsw.gov.au/council/", "image_url": "", "created": "2025-06-24T04:26:39.521785", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-haslams-creek-frmsp", "title": "DataNSW"}, "original_name": "nsw-fdp-haslams-creek-frmsp", "owner_org": "aeb69f32-d40e-4eed-a699-7d1a8ef0519f", "private": false, "promotion_level": "0", "remote_last_updated": "2024-03-25 06:31:29.278673", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2022-02-02 22:38:57.638567", "temporal_coverage_to": "2003-01-01 00:00:00", "title": "Haslams Creek Floodplain Risk Management Study & Plan", "type": "dataset", "unpublished": false, "url": "", "version": null, "extras": [{"key": "harvest_object_id", "value": "13931026-5d78-4610-9d17-d827b0417f51"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2024-03-25T06:31:29.300067", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "8c41dddf-62b0-4ad2-8511-6ba657ffa70a", "last_modified": null, "metadata_modified": "2025-06-23T18:39:32.867065", "mimetype": null, "mimetype_inner": null, "name": "Haslams Creek - Floodplain Risk Management Study & Plan", "package_id": "0c254f53-6ac1-44d8-94dd-bf2d74f7af12", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/c9710ffb-f9c5-4471-9419-e5572fb44a52/resource/d2f22922-13bb-45bc-8dfe-706560fcc7e3", "url_type": null, "zip_extract": false}, {"cache_last_updated": null, "cache_url": null, "created": "2024-03-25T06:31:29.300073", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "9958ba7b-0bbb-4bce-afec-844b15c4a2b6", "last_modified": null, "metadata_modified": "2025-06-23T18:39:32.868781", "mimetype": null, "mimetype_inner": null, "name": "Haslams Creek - Floodplain Risk Management Study &  Plan Appendices to Final Report", "package_id": "0c254f53-6ac1-44d8-94dd-bf2d74f7af12", "position": 1, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/c9710ffb-f9c5-4471-9419-e5572fb44a52/resource/06724b7d-d6b2-4b66-a24c-e380094003b6", "url_type": null, "zip_extract": false}], "tags": [{"display_name": "Auburn", "id": "fc0cee8b-112d-407d-b376-f5ce054439c4", "name": "Auburn", "state": "active", "vocabulary_id": null}, {"display_name": "Berala", "id": "5dd7a27d-a09e-4d28-b030-a770318e530b", "name": "Berala", "state": "active", "vocabulary_id": null}, {"display_name": "Haslams Creek", "id": "c7c30651-cbf7-4541-bc0b-6783fdb6b3a2", "name": "Haslams Creek", "state": "active", "vocabulary_id": null}, {"display_name": "Lidcombe", "id": "ef5ff44f-08be-4820-a5a2-a37be612b66f", "name": "Lidcombe", "state": "active", "vocabulary_id": null}], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}