-
Kangaroo Valley Floodplain Risk Management Study - Community Consultation
Survey, brochure, workshop, public exhibition -
Lt Creek Floodplain Risk Management Study and Plan - results
WaterRIDE and Tuflow outputs 20yr and 100yr ARI -
Birds Gully and Bunnerong Road Flood Study - Hydraulic Model Inputs (TUFLOW)
Hydraulic Model Inputs (TUFLOW) -
Lake Macquarie - Floodplain Risk Management Study October 2000
The objectives of this study are: to define the nature and extent of the flood hazard, to identify, assess and optimise strategies and measures aimed at reducing the impact of... -
Post 2022 Event Flood Behaviour Analysis – Tweed/Byron Coastal Creeks Report
NSW Department of Climate Change, Energy, the Environment and Water
This report was commissioned by DCCEEW to collate information and assess the impacts of the February/March 2022 floods. -
Greendale Creek Flood Study GIS Layers
Post-processed layers for Depth, Height, Velocity, Hydraulic Categories, Z0, Z1, ZAEM1. Flood events: 0.5%, 0.2%, 1%, 2%, 5%, 10%, 20%, 50%, PMF, 1% with 0.4m SLR and 10%... -
Lower Macleay FRMS TUFLOW results - Design flood events
Lower Macleay FRMS TUFLOW results - Design flood events. Max envelope grids, flood level contours, velocity vectors for selected events, ts and PO outputs. -
Kogarah Bay Creek - Flood & Overland Flow Study - Hydraulic Model (HEC-RAS)
Hydraulic Model (HEC-RAS) - Inputs and Outputs -
All other modelling data
All other modelling data, hydraulic and hydrologic model inputs and outputs.