-
River Murray Water Quality Monitoring Program
Phytoplankton and physico-chemical monitoring along the River Murray were established in 1978 under the River Murray Water Quality Monitoring Program (RMWQMP). The phytoplankton... -
Groundwater SDL Resource Units
This dataset defines the boundaries of the 80 groundwater SDL resource units in the Murray-Darling Basin described in Schedule 4 of the Basin Plan. These include 11 groundwater... -
Murray-Darling Basin Water Resource Plan Areas – Surface Water
The Basin Plan's management arrangements will be implemented at a local scale through water resource plans prepared by the Basin states for accreditation by the Commonwealth... -
Murray-Darling Basin Water Resource Plan Areas – Groundwater
This dataset defines the boundaries of the 19 groundwater water resource plan areas (WRPAs) for the Murray-Darling Basin. 2 of the groundwater water resource plan areas have... -
Murray-Darling Basin Fish and Macroinvertebrate Survey
MDBA Fish and Macroinvertebrate Survey data 2004 to 2022 (Implementation Periods 1 to 17). An Access 2013 version database in relational form including all controlled... -
Murray-Darling Basin Tree Stand Condition Assessment Tool
The stand condition of river red gums, black box and coolibah have been identified as objectives to measure the progress towards achieving outcomes of the Murray-Darling Basin... -
Waterbird data for the Basin Plan Evaluation 2020
Overview The aerial waterbird survey (AWS) analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual aerial survey data across 38 key wetlands across... -
Vegetation data for the Basin Plan Evaluation 2020
Overview The reporting of this data is required to meet statutory obligations under the Basin Plan. Reporting against vegetation targets is specified in the Basin Plan as well... -
Modelled hydrologic data for the Basin Plan Evaluation 2020
Overview The hydrologic condition analysis for the 2020 Basin Plan Evaluation drew on data of estimated flows derived from hydrologic modelling done during the development of... -
Hydrologic indicator results for the Basin Plan Evaluation 2020
Overview The MDBA analysed hydrologic condition in the Basin across a range of metrics or 'flow components'. The immediate results of this analysis and well as the results from... -
Environmental watering data for the Basin Plan Evaluation 2020
Overview The reporting of this data is required to meet statutory obligations under Schedule 12 of the Basin Plan (2012). Reporting of environment water use refers to Matter 9.3... -
Fish data for the Basin Plan Evaluation 2020
Overview The fish monitoring analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual fish monitoring sampling data, from the Murray--Darling Basin...