-
Waterbird data for the Basin Plan Evaluation 2020
Overview The aerial waterbird survey (AWS) analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual aerial survey data across 38 key wetlands across... -
Modelled hydrologic data for the Basin Plan Evaluation 2020
Overview The hydrologic condition analysis for the 2020 Basin Plan Evaluation drew on data of estimated flows derived from hydrologic modelling done during the development of... -
Observed hydrologic data for the Basin Plan Evaluation 2020
Overview The hydrologic analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on watercourse discharge observations made at gauging stations across the... -
Hydrologic indicator results for the Basin Plan Evaluation 2020
Overview The MDBA analysed hydrologic condition in the Basin across a range of metrics or 'flow components'. The immediate results of this analysis and well as the results from... -
Catchment inflow data for the Basin Plan Evaluation 2020
Overview Estimates of inflows into catchments was a core component of the hydrologic condition analysis done for the 2020 Basin Plan Evaluation. These catchment inflows were... -
Fish data for the Basin Plan Evaluation 2020
Overview The fish monitoring analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual fish monitoring sampling data, from the Murray--Darling Basin...