JSON   RDF   ISO19115/ISO19139 XML

Cost of Salinity to Local Infrastructure 1996-97 – Total cost to the bridge component of infrastructure based on the best estimate as described in the project reports. Costs are estimates of the impact of the extent of salinity projected to occur in 2020

This dataset contains 14 national surfaces, represented by 1km grids, relating to the cost of salinity damage to local infrastructrure. The infrastructure cost impacts are limited to those that occur at the location of salinity problem, downstream and other offsite impacts are not covered. All dollar values are given in 1996/97 Australian dollars. Each is described as follows:1. Total cost ($) to all infrastructure (buildings, road, rail and bridges) based on the low, abesta and high estimates of the impact of the current (2000) extent of salinity.2. Total cost ($) to all infrastructure (buildings, road, rail and bridges) based on the low, abesta and high estimates of the impact of predicted 2020 extent of salinity3. Total cost ($) the general infrastructure component (buildings etc., derived from population) as the abesta estimate of the impact of the current (2000) extent of salinity.4. Total cost ($) the general infrastructure component (buildings etc., derived from population) based on the abesta estimate of the impact of the predicted 2020 extent of salinity5. Total cost ($) the road component of infrastructure based on the abesta estimate of the impact of the current (2000) extent of salinity.6. Total cost ($) the road component of infrastructure based on the abesta estimate of the impact of the predicted 2020 extent of salinity7. Total cost ($) the rail component of infrastructure based on the abesta estimate of the impact of the current (2000) extent of salinity.8. Total cost ($) the rail component of infrastructure based on the abesta estimate of the impact of the predicted 2020 extent of salinity9. Total cost ($) the bridge component of infrastructure based on the abesta estimate of the impact of the current (2000) extent of salinity.10. Total cost ($) the bridge component of infrastructure based on the abesta estimate of the impact of the predicted 2020 extent of salinity11. Total cost ($) increase to local infrastructure based on the abesta estimate of the impact of the predicted 2020 extent of salinity

See further metadata for more detail.

Data and Resources

Additional Info

Field Value
Title Cost of Salinity to Local Infrastructure 1996-97 – Total cost to the bridge component of infrastructure based on the best estimate as described in the project reports. Costs are estimates of the impact of the extent of salinity projected to occur in 2020
Type Dataset
Language English
Licence notspecified
Data Status inactive
Update Frequency never
Landing Page https://data.gov.au/data/dataset/87823f5a-eb84-4a0a-8fe8-ace56520d394
Date Published 2013-05-12
Date Updated 2023-08-11
Contact Point
Australian Bureau of Agricultural and Resource Economics and Sciences
data.gov@finance.gov.au
Temporal Coverage 2013-05-12 09:56:57
Geospatial Coverage Australia
Jurisdiction Commonwealth of Australia
Data Portal data.gov.au
Publisher/Agency Australian Bureau of Agricultural and Resource Economics and Sciences