Flood - Depth Classified 10% AEP

Created 25/09/2025

Updated 28/09/2025

Moreton Bay City Flood Database

River and Creek Flooding

Version 3.1.0 (October 2023)

This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside.

Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. 

Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris.

Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. 

Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values.

Modelled Probability: The probability of flooding represented by this dataset is: 10% Chance of Flooding in Any One Year

Likelihood: Likely Annual Exceedance Probability (AEP): 10%

Average Recurrence Interval (ARI): 10 Year

Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023)

Version Resolution: 2.5m

Data Reliability: A 

Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data 

Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding

Files and APIs

Tags

Additional Info

Field Value
Title Flood - Depth Classified 10% AEP
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/cfa54ca9-e8b5-46dd-a63c-146223d0c6c2
Remote Last Updated
Contact Point
City of Moreton Bay's Data Hub
gis@moretonbay.qld.gov.au
Reference Period
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        152.5994,
        -27.4349
      ],
      [
        152.5994,
        -26.7662
      ],
      [
        153.2094,
        -26.7662
      ],
      [
        153.2094,
        -27.4349
      ],
      [
        152.5994,
        -27.4349
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal Moreton Bay Regional Council

Data Source

This dataset was originally found on Moreton Bay Regional Council "Flood - Depth Classified 10% AEP". Please visit the source to access the original metadata of the dataset:
https://datahub.moretonbay.qld.gov.au/maps/moretonbay::flood-depth-classified-10-aep