Planning for a future Murray River crossing at Swan Hill : community feedback summary report

Created 25/06/2025

Updated 25/06/2025

This report summarises Transport for NSW’s consultation with the Swan Hill and Murray Downs community and stakeholders about the preferred alignment of a future Murray River crossing at Swan Hill. Between Monday 14 September and Friday 13 November 2020, Transport for NSW called for community feedback and comments about two options for the alignment of a future bridge in Swan Hill. These two options are: 1. Option 9a, located about 120 metres upstream (east) of the existing bridge, and 2. McCallum Street Option, located at the existing bridge alignment at McCallum Street. All feedback received has been reviewed and is summarised in this report to help inform future planning for a future bridge.

Files and APIs

Tags

Additional Info

Field Value
Title Planning for a future Murray River crossing at Swan Hill : community feedback summary report
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/e6e32a89-b7e7-4f87-9aba-8005b05201c9
Remote Last Updated 09/09/2021
Contact Point
Reference Period 09/09/2021
Geospatial Coverage New South Wales
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Planning for a future Murray River crossing at Swan Hill : community feedback summary report". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-3-18923-planning-for-a-future-murray-river-crossing-at-swan-hill-community-feedback-summary