Mol_FRMS&P_Hydraulic_Model_Input.zip

Created 19/12/2025

Updated 19/12/2025

Molong Flood Risk Management Study and Plan - Hydraulic Model Input Files

Contains hydraulic model for future infill development conditions and the potential flood mitigation measures. Refer Molong Flood Study for hydrologic model for present day conditions.

Files and APIs

Tags

Additional Info

Field Value
Title Mol_FRMS&P_Hydraulic_Model_Input.zip
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/93ca2edd-a18f-44da-a16d-5bb9c0af0eaf
Remote Last Updated 17/12/2025
Contact Point
Cabonne Shire Council
council@cabonne.nsw.gov.au
Reference Period 01/08/2023 - 01/10/2024
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Mol_FRMS&P_Hydraulic_Model_Input.zip". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-mol_frms-p_hydraulic_model_input-zip