Report on geophysical surveys at Mt Lyell carried out by G Douglas on behalf of Mt Lyell Company (supplementary to report dated 13/5/48)

Created 17/10/2025

Updated 17/10/2025

Note on plan No. G.26-2, which shows the results of Equipotential Line surveys conducted on the Comstock Area, during the years 1937 and 1938. It is supplementary to Plan No. G.26-1 which shows the results of similar surveys on the southern part of the Mt. Lyell area. Plan No. G.26-2 should be studied together with this plan and the accompanying report dated 13th May, 1948.

Files and APIs

Tags

Additional Info

Field Value
Title Report on geophysical surveys at Mt Lyell carried out by G Douglas on behalf of Mt Lyell Company (supplementary to report dated 13/5/48)
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/e0f74843-d2ac-465c-aedd-f5410f4bf64b
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        145.1,
        -42.2
      ],
      [
        145.8,
        -42.2
      ],
      [
        145.8,
        -41.7
      ],
      [
        145.1,
        -41.7
      ],
      [
        145.1,
        -42.2
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Report on geophysical surveys at Mt Lyell carried out by G Douglas on behalf of Mt Lyell Company (supplementary to report dated 13/5/48)". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/report-on-geophysical-surveys-at-mt-lyell-carried-out-by-g-douglas-on-behalf-of-mt-lyell-com-48