-
Water Modelling-Modelled Data-Without Development-Barwon-Darling
NSW Department of Climate Change, Energy, the Environment and Water
Time series of modelled daily flow rates in megalitres per day across the NSW river systems – Barwon-Darling. Individual for each available river gauge data sets are attained... -
Full-time equivalent (FTE) enrolments by individual NSW government schools,...
Data Notes:- Data is derived from the National Schools Statistics Collection (NSSC), which is managed by the Australian Bureau of Statistics. ...
-
Broadscale Microplastic Assessment Dashboard
NSW Department of Climate Change, Energy, the Environment and Water
This dashboard presents the results of the Broadscale Microplastic Assessment, the first statewide evaluation of microplastic contamination across 120 estuaries in New South... -
Water Modelling-Modelled Data-Long-term average annual extraction limit...
NSW Department of Climate Change, Energy, the Environment and Water
Long-term average annual extraction limit (LTAAEL) is a regulatory limit set on annual water extractions from a river system. It ensures that average extractions over the long... -
Water Modelling-Water Models-Without Development-Murrumbidgee
NSW Department of Climate Change, Energy, the Environment and Water
The Murrumbidgee River 'without development' model is a hydrological model of the Murrumbidgee River system that does not represent river system infrastructure, extractions or... -
Climate Vulnerability Assessment: Dryland Canola
Department of Primary Industries and Regional Development (DPIRD)
The Climate Vulnerability Assessment was designed to provide an overview of the impact of future climate change on all stages of production for the commodities... -
Climate Vulnerability Assessment: Parthenium Weed
Department of Primary Industries and Regional Development (DPIRD)
The Climate Vulnerability Assessment was designed to provide an overview of the impact of future climate change on all stages of production for the commodities... -
NSW Land Parcel and Property Theme - Road Centreline
Suburb LGA Concordance Table Public
THIS ITEM HAS BEEN DEPRECATED. PLEASE USE UPDATED ITEM: NSW Boundary Concordance...Secondary education schools by selective, specialist and co-educational...
Data Notes:- Includes secondary schools and central/community schools.
- Secondary schools generally enrol students in Years 7 to 12, although...
Water Modelling-Palaeo Stochastic Climate Data-Western
NSW Department of Climate Change, Energy, the Environment and Water
This Palaeo stochastic climate dataset relates to the Western region. The stochastic data are 10,000-year daily data sets of rainfall and potential...NSW Historical Topographic Map Layer
Metadata Portal Metadata Information Content TitleNSW...Water Modelling-Modelled Data-Regional Water Strategy-Richmond
NSW Department of Climate Change, Energy, the Environment and Water
The datasets provided contain modelled daily streamflow, and storage volume data for several NSW river systems. These data were generated by simulating baseline river system...Wolumba Catchment Flood Study
Study Area The study area is located in south west Sydney and covers the northern part of the suburb of Chester Hill. It is an urban catchment that drains through a stormwater...Biodiversity Values Map
NSW Department of Climate Change, Energy, the Environment and Water
The Biodiversity Values Map (BV Map) identifies land with high biodiversity value that is particularly sensitive to impacts from development and clearing. The BV Map is one of...Leeton Shire Floodplain Risk Management Study and Plan - Final Report
The Leeton Shire Floodplain Risk Management Study (FRMS) has been undertaken subsequent to the Leeton Shire Flood Study (Engeny, 2015). A key objective of the Leeton Shire FRMS...Lake Macquarie City Flood Studies & Floodplain Risk Management Studies/Plans - Map
Map displaying the extents of flood studies, floodplain risk management studies/plans, and the years of their completion.Rose Bay Floodplain Risk Management Study and Plan
As described in the Floodplain Development Manual (Reference 1), the Floodplain Risk Management Process entails four sequential stages:- Stage 1: Flood Study ...